State:
KENTUCKY Agency: KENTUCKY
TRANSPORTATION CABINET - DISTRICT 9 Project and/or Route Name: KY 11 -
BATH/MONTGOMERY COUNTIES Dates: 1997 -
PRESENT Rural
and/or Urban: RURAL Length: 7.7 km (4.8 Miles) Type of Improvement: 2-LANE RURAL ROADWAY Firm's
Project Manager: MICHAEL G. BRUCE,
P.E., L.S., VICE PRESIDENT, FIRM PRINCIPAL Firm's
Project Engineer: THOMAS D.
WILLIAMS, P.E., PROJECT DESIGN ENGINEER Project
Description: This project consisted of a 2-lane rural roadway in Bath and
Montgomery Counties. The project was
a realignment of KY 11 from south
Hinkston Creek to north of Sharpsburg. The
Consultant was responsible for: PHASE II
DESIGN: 1. All
necessary field surveys, including
check sections, drainage and property corners. 2. Preparation
of grade, drain and surfacing plans. 3. Preparation
of right-of-way plans, including deeds for 65 parcels. 4. Design
of the bridge over Hinkston Creek. 5. Computation
of all quantities and estimation
of all costs. 6. Producing
maintenance of traffic plans. 7. Producing
all general and special notes and provisions. 8. Preparation
of erosion control plans. 9. Soil investigation (through
Subconsultant). The
Department was responsible for: 1. Traffic counts and traffic movements. |