State:
KENTUCKY Agency: KENTUCKY
TRANSPORTATION CABINET - DISTRICT 11
Project and/or Route Name: KY HWY. 92, PINE KNOT
TO WILLIAMSBURG ROAD, WHITLEY COUNTY Dates: 1999 - PRESENT Rural
and/or Urban: RURAL Length: 6.45 MILES Type of Improvement: PROVIDING A RELOCATION OF KY 92 ON A
NEW ALIGNMENT AND UPGRADING TO A SUPER 2 LANE FACILITY THROUGH MOUNTAINOUS TERRAIN INCLUDING 0.64 MILES OF
3 LANE CURB AND GUTTER WIDENING AND OVERLAY OF THE EXISTING ALIGNMENT Firm's
Project Manager: MICHAEL G. BRUCE,
P.E., L.S., SR. VICE PRESIDENT, FIRM PRINCIPAL Firm's
Project Engineer: PAUL M. WEST,
P.E., VICE PRESIDENT, FIRM PRINCIPAL Project Description: This project consisted of a 6.45-mile
section of Ky. Hwy. 92 beginning at Cornbread Branch and ending at the ramp
termini on the West side of Interstate 75,
including alignment and grade studies and Phase II Design Plans. The ultimate design speed was 55 MPH. The
Consultant was responsible for: 1. All studies, cost estimates and recommendations
for preliminary alignment. 2. All highway surveys. 3. Establishing
properties and property lines. 4. Preparation of Grade and Drain Plans. 5. Furnishing exhibits for and participating
in public meetings. 6. Geotechnical
Investigations. 7. Preparing drainage situations and drainage
folders for the project. 8. Contacting
all property owners. 9. Submitting data for Corps of
Engineers permits. 10.
Advance situation structure design including one bridge and nine culverts. 11.
Right-of-Way Plans and
related services including deed
preparation for the project. 12. Surface
Design. 13. A Maintenance
of Traffic Plan. The
Department was responsible for: 1. Photogrammetric work including
electronic manuscripts and DTM data. 2. Traffic Projections. |