State: KENTUCKY Agency: KENTUCKY
TRANSPORTATION CABINET - DISTRICT 4 Project and/or Route Name: KY HWY. 245, BARDSTOWN NELSON
COUNTY, KENTUCKY Dates: OCT.
1996 - JAN. 1998 Rural
and/or Urban: RURAL AND
URBAN Length: 3.1 MILES
(5.0 KILOMETERS) Type of Improvement: WIDENING AN EXISTING
2-LANE HIGHWAY Firm's Project Manager: MICHAEL G. BRUCE, P.E., L.S., VICE
PRESIDENT, FIRM PRINCIPAL Firm's Project Engineer: PAUL M. WEST, P.E., PROJECT DESIGN
ENGINEER Project
Description: The project consisted of widening the roadway to five lanes through rural, industrial and
commercial areas where available right-of-way was limited, and adding
additional turn lanes to major intersections - US 31E and US 62. This was a "Fast-Track" project.
ROW plans were submitted within
six months and Final Plans were one month ahead of schedule. The
Consultant was responsible for: 1. Contacting property
owners. 6. Preparing drainage situation drawings and 2. All surveys,
including pavement elevations under calculations and compiling drainage folders, heavy traffic. including
storm sewers. 3. Preparing intersection capacity analyses. 7. Designing drainage
structure extensions 4. All office work to provide grade, drain and including five culverts. surfacing
plans for construction of the project. 8. Six
Intersections. 5. ROW
Plans and ROW Plans for Utilities and 9. Prepare railroad crossing detail sheets. related services including deed preparation. The
Department was responsible for: 1. Traffic and accident data. 4. Surface Design. 2. Aerial Manuscripts and DTM. 5. Original road plans. 3. Geotechnical Investigations. |
||
|
|