State:                                      KENTUCKY

 

                                                                                                                                                                              

Agency:                                   KENTUCKY TRANSPORTATION CABINET - DISTRICT 10                        

                                                                                                                                                                              

Project and/or Route Name:                                 WOLVERINE ROAD (KY 3193) - BREATHITT COUNTY    

 

Dates:                                     1995 - 1996

 

Rural and/or Urban:              RURAL

 

Length:                                               0.20 MILES

 

Type of Improvement:                      2-LANE RURAL; BRIDGE AND APPROACHES

 

                                                                                                                                                                              

Firm's Project Manager:       MICHAEL G. BRUCE, P.E., L.S., VICE PRESIDENT, FIRM PRINCIPAL      

Firm's Project Engineer:      THOMAS D. WILLIAMS, P.E., PROJECT DESIGN ENGINEER                    

 

Project Description:

 

This project consisted of a roadway and bridge across the North Fork of the Kentucky River connecting KY 3193 with KY 15, north of Jackson in Breathitt County.

 

The Consultant was responsible for:

 

PHASE I DESIGN:                                                     PHASE II DESIGN:

 

1.   Preliminary plans developed through the           1.   All necessary field surveys, including cross sections.

      preliminary line and grade inspection stage,        2.   Preparation of grade, drain and surfacing plans.

      including cost estimates.                                    3.   Preparation of right-of-way plans, including deeds for

2.   Contour manuscripts for alignment studies.           4 parcels.

3.   Preliminary hydraulic analysis of all                  4.   Design of the bridge.

      drainage.                                                               5.   Computation of all quantities & est. of all costs.

4.   Property lines and owners.                               6.   Producing maintenance of traffic plans.

5.   Critical cross sections.                                      7.   Producing all general & special notes and provisions.

 

The Department was responsible for:

 

1.   Soils investigation.                                                            2.   Traffic movements.