State:
KENTUCKY Agency: KENTUCKY
TRANSPORTATION CABINET - DISTRICT 2 Project and/or Route Name: KY 1751, NORTH MAIN STREET, MADISONVILLE, HOPKINS COUNTY Dates: 1993 -
1998 Rural
and/or Urban: URBAN Length: 1.4 MILES
(2.25 KM) Type of
Improvement: STUDY
OF A FIVE-LANE EXPANSION OF AN EXISTING TWO-LANE HIGHWAY AND A BRIDGE REPLACEMENT Firm's Project Manager: MICHAEL G. BRUCE, P.E., L.S., VICE
PRESIDENT, FIRM PRINCIPAL Firm's Project Engineer: PAUL M. WEST, P.E., PROJECT DESIGN
ENGINEER Project
Description: The project consisted of surveys, intersection re-alignment
studies, retaining wall and right-of-way
studies, culvert extensions and maintenance
of traffic studies for bridge
replacement and roadway widening. Preliminary
Line and Grade plans were submitted.
A public meeting was
held. Phase I design was completed. The Consultant
was responsible for: 1. All studies, cost estimates and recommendations for preliminary alignment. 2. Topographic
surveys, cross sections and plan sheet development. 3. Exhibits
for the public meetings. 4. Drainage
Studies and Blueline Stream Report. 5. Revised
Intersection Geometric Details. 6. Alternates
for stage construction of a 5-lane bridge and removal of the existing 2-lane bridge located on the same alignment while maintaining two-way traffic. 7. Providing proposed right-of-way to the Department for estimates. The Department was responsible for: 1. Providing traffic information. 2. Conducting public meetings. 3. Preparing right-of-way and utility estimates. 4. Environmental Studies. 5. Soils Investigations. |