State:                                       KENTUCKY

 

Agency:                                   KENTUCKY TRANSPORTATION CABINET - DISTRICT 4                          

 

Project and/or Route Name:                      US HWY. 150 - SECTION 1, SPRINGFIELD-DANVILLE ROAD

                                                   WASHINGTON COUNTY, KENTUCKY                                                         

 

Dates:                                        1987 - 1993

 

Rural and/or Urban:                RURAL

 

Length:                                     2.77 MILES

 

Type of Improvement:                    RELOCATION AND UPGRADING OF AN EXISTING 2-LANE HIGHWAY

 

Firm's Project Manager:       WILLIAM B. WEST, P.E., L.S., SR. VICE PRESIDENT, FIRM PRINCIPAL   

                                                 MICHAEL G. BRUCE, P.E.,L.S., VICE PRESIDENT, FIRM PRINCIPAL       

Firm's Project Engineer:      PAUL M. WEST, P.E., PROJECT DESIGN ENGINEER                                 

 

Project Description:

 

The project consisted of an addendum to the Department's Planning Report, Phase I Design, an Environmental Analysis and final Phase II Design of a portion of the project from approximately 1,500 feet West of Mill Creek to approximately 200 feet east of Beech Fork including alternate alignments, cost estimates and drainage for a two-lane highway consisting of two 12 foot lanes with 12 foot paved shoulders.

 

The Consultant was responsible for:

 

1.    All corridor locations.                                                   8.    All surveys.

2.    All Environmental Studies.                                          9.    ROW Plans and Right-of-Way Plans for Utilities

3.    All studies, cost estimates & recommendations                and related services including deed preparation.

       for preliminary alignment.                                           10.  Preparing drainage situation drawings and

4.    Compiling a FONSI Environmental Document                 calculations and compiling drainage folders.

       with a Final Section 4(F) Evaluation.                        11.   Designing drainage structures including

5.    Writing the Design Executive Summary.                           three stream bridges.

6.    Contacting all property owners.                                12.   Geotechnical. (By Sub-Consultant)

7.    All office work to provide grade, drain &                      13.   Preparing exhibits for public participation.

       surfacing plans for construction of the project.

 

The Department was responsible for:

 

1.    Traffic and accident data.                                       3.    Cross Sections.

2.    Aerial Manuscripts.                                                 4.    Surface Design.