State: KENTUCKY Agency: KENTUCKY
TRANSPORTATION CABINET - DISTRICT 4 Project and/or Route Name: US HWY. 150 - SECTION 1, SPRINGFIELD-DANVILLE
ROAD WASHINGTON COUNTY, KENTUCKY Dates: 1987 -
1993 Rural
and/or Urban: RURAL Length: 2.77
MILES Type of Improvement: RELOCATION AND UPGRADING
OF AN EXISTING 2-LANE HIGHWAY Firm's
Project Manager: WILLIAM B. WEST,
P.E., L.S., SR. VICE PRESIDENT, FIRM PRINCIPAL MICHAEL
G. BRUCE, P.E.,L.S., VICE PRESIDENT, FIRM PRINCIPAL Firm's
Project Engineer: PAUL M. WEST,
P.E., PROJECT DESIGN ENGINEER Project
Description: The project consisted of an addendum to the Department's
Planning Report, Phase I Design, an Environmental Analysis and final Phase II
Design of a portion of the project from approximately 1,500 feet West of
Mill Creek to approximately 200 feet east of Beech Fork including alternate alignments, cost estimates and
drainage for a two-lane highway consisting of two 12 foot lanes with 12 foot
paved shoulders. The
Consultant was responsible for: 1. All corridor
locations.
8. All surveys. 2. All
Environmental Studies. 9. ROW
Plans and Right-of-Way Plans for Utilities 3. All
studies, cost estimates &
recommendations and related services including deed preparation. for preliminary alignment. 10. Preparing drainage situation drawings and 4. Compiling a FONSI Environmental Document
calculations and compiling drainage folders. with
a Final Section 4(F) Evaluation. 11. Designing drainage structures including 5. Writing the Design Executive Summary. three
stream bridges. 6. Contacting
all property owners. 12. Geotechnical. (By Sub-Consultant) 7. All office work to provide grade, drain & 13. Preparing exhibits for public participation. surfacing
plans for construction of the project. The
Department was responsible for: 1. Traffic and accident data. 3. Cross Sections. 2. Aerial Manuscripts. 4. Surface Design.
|
||||
|
|