State: KENTUCKY Agency: KENTUCKY
TRANSPORTATION CABINET - DISTRICT 9 Project and/or Route Name: AA HIGHWAY - SECTION 32 FROM WOLF CREEK NEAR JOHN HOWARD HOLLOW
IN LEWIS COUNTY TO THE INTERSECTION OF HALL'S FORK
WITH GRASSY CREEK - CARTER COUNTY Dates: 1985
- 1988 Rural and/or Urban: RURAL Length: 5.1
MILES Type of Improvement: NEW LOCATION OF A 4-LANE
DIVIDED ROADWAY WITH A 14 FOOT
FLUSH MEDIAN BUT
INITIAL CONSTRUCTION WAS TO BE 2 LANES WITH TRUCK
CLIMBING LANES WHERE WARRANTED.
DESIGN SPEED WAS 60 MPH THROUGH
MOUNTAINOUS TERRAIN. Firm's
Project Manager: WILLIAM B. WEST,
P.E., L.S., SR. VICE PRESIDENT, FIRM PRINCIPAL Firm's
Project Engineer: MORRIS W. GUTHRIE,
P.E., PROJECT DESIGN ENGINEER Project
Description: The Consultant was responsible for: 1. All
studies, cost estimates and
recommendations for location and
preliminary alignment. 2. All
necessary field surveys. 3. Establishing properties and property lines. 4. Hydraulic analysis and preparing drainage situations and drainage folders for the project. 5. All
geotechnical exploration and
engineering. 6. Contacting all property owners. 7. Preparation
of Grade and Drain Plans. 8. Preparation
of Right-of-Way Plans and Right-of-Way
Plans for Utilities and related services including deed preparation for the project. 9. All
Structure Plans including three box culverts. 10. Separate Surfacing Plans. 11. A Maintenance
of Traffic Plan. The Department was responsible for: 1. Photogrammetric work including manuscripts and cross sections. 2. Traffic Data. 3. Pavement Design. |