Agency: KENTUCKY
TRANSPORTATION CABINET - DISTRICT 7 Project and/or Route Name: US HWY 127, HARRODSBURG TO LAWRENCEBURG ROAD MERCER
COUNTY Dates: 1989
- 1990 Rural and/or Urban: RURAL Length: 3.82
MILES Type of Improvement: PROVIDING
THE ULTIMATE TWO LANES FOR A 4-LANE FACILITY BY UPGRADING
AN EXISTING ROADWAY ADJACENT TO A PREVIOUSLY CONSTRUCTED
INITIAL TWO LANES Firm's
Project Manager: WILLIAM B. WEST,
P.E., L.S., SR. VICE PRESIDENT, FIRM PRINCIPAL Firm's
Project Engineer: MAURICE L.
JORDAN, P.E., PROJECT DESIGN ENGINEER Project Description: This project consisted of Phase II Design including all surveys, establishing a median width and grade on the new roadway
compatible with the previously constructed lanes. Alignment
and grades were established to minimize
impact on the adjacent property. Safety
slopes were a requirement. The ultimate design speed was 60 M.P.H. The
Consultant was responsible for: 1. Contacting
all property owners. 2. All highway surveys. 3. Establishing
properties and property lines. 4. Preparation of Grade and Drain Plans. 5. Geotechnical Investigations. (By Sub-Consultant) 6. Preparing drainage situation calculations and compiling drainage folders for the project. 7. All median drainage. 8. Right-of-Way
Plans and Right-of-Way Plans for
Utilities and related services including deed preparation for the project. 9. Separate Surfacing Plans. 10. A Maintenance
of Traffic Plan. The
Department was responsible for: 1. Photogrammetric work including
manuscripts and cross sections. 2. Pavement Design. 3. Traffic Projections. 4. Right-of-Way and Utility Cost
Estimates. |