State: KENTUCKY Agency: KENTUCKY
TRANSPORTATION CABINET - DISTRICT 2 Project and/or Route Name: U.S. HWY. 62 OVER POND
RIVER Dates: 1996 -
1997 Rural
and/or Urban: RURAL Length: 500 METERS Type of Improvement: BRIDGE REPLACEMENT Firm's
Structural Proj. Mgr: ROBERT B.
QUISENBERRY, P.E.,SR. V.P., FIRM PRINCIPAL Firm's
Structural Proj Engr: PAUL L. HENDRICK,
P.E., PROJECT DESIGN ENGINEER Firm's
Roadway Proj. Engr.: MICHAEL G. BRUCE,
P.E., L.S., VICE PRESIDENT, FIRM PRINCIPAL Project Description:
The existing bridge carrying U.S.
Hwy. 62 over Pond River had deteriorated to the point of needing complete
replacement. A portion of U.S. Hwy. 62 was relocated to improve
approaches and to allow traffic to use the existing bridge while the new
bridge was being constructed. A three span structure was selected to satisfy drainage requirements.
A center span of 31 meters
was needed to keep the piers out of
the river bed. End spans are 20 meters each giving an overall length of 72 meters.
The bridge is straight and
skewed 20 degrees left. Superstructure framing consists of 5 lines of Type 4 PCI beams with a composite concrete deck. The overall
width of the deck is 13 meters. The substructure is
made up with Integral End Bents on
steel piling and one pier is on piling and the other is founded on rock. Plans were completed in 1997, and construction
completed in 1999.. Plans are
prepared in metric units and the estimated cost of the bridge is $500,000.00. The Consultant was
responsible for: 1. Complete
survey work. 2. Drainage Design. 3. Final Construction Plans,
Specifications and Cost Estimates. The
Department was responsible for: 1. All
geotechnical data. |