State: KENTUCKY Agency: KENTUCKY DEPARTMENT OF
TRANSPORTATION - DISTRICT 4 OFF-NHS
BRIDGE REPLACEMENT PROGRAM - DISTRICTS 2 AND 4 Project and/or Route Name: BLOOMINGTON CHURCH
ROAD OVER BEAR CREEK Dates: 1996 Rural
and/or Urban: RURAL Length: 200 METERS Type of Improvement: BRIDGE REPLACEMENT WITH ASSOCIATED
APPROACH WORK Firm's Structural Proj Mgr: ROBERT B.
QUISENBERRY,P.E.,L.S.,V.P.-STRUCTURES, FIRM PRINCIPAL Firm's Structural Proj Engr: PAUL
L. HENDRICK, P.E., PROJECT DESIGN ENGINEER Firm's Roadway Proj Engr: MICHAEL G. BRUCE, P.E., L.S., VICE PRESIDENT, FIRM PRINCIPAL Project
Description: This bridge is a replacement for an
older steel truss bridge that carries County Road 5147 over Bear Creek and is
scheduled for construction in mid 1996.
The old bridge is to be removed
and the new wider bridge built on the same alignment. The road
will be closed during construction.
The new structure is proposed
to be a single span with a length of 26 meters. The framing will consist
of a concrete deck on PC box beams.
The substructures are two end
bents on piling and are square with the roadway. All plans
are in metric. The
Consultant was responsible for: 1. All surveys and field work. 2. Preparation of Grade and Drain Plans for approaches. 3. Preparing drainage calculations. 4. Preparing Advance Situation Folder. 5. Cost
Estimate. 6. Final
Bridge Plans. The
Department was responsible for: 1. Geotechnical Investigation. |