State:                                      KENTUCKY

 

Agency:                                   KENTUCKY TRANSPORTATION CABINET - DISTRICT 4                          

 

Project and/or Route Name: BLOOMINGTON CHURCH ROAD OVER BEAR CREEK

                                                  GRAYSON COUNTY

 

Dates:                                     1996 - 1997

 

Rural and/or Urban:              RURAL

 

Length:                                   180 METERS

 

Type of Improvement:          BRIDGE REPLACEMENT WITH ASSOCIATED APPROACH WORK

 

Firm's Structural Proj Mgr:  ROBERT B. QUISENBERRY,P.E.,L.S.,V.P.-STRUCTURES, FIRM PRINCIPAL

Firm's Structural Proj Engr: PAUL L. HENDRICK, P.E., PROJECT DESIGN ENGINEER

 

Project Description: This project consisted of replacing an old single lane truss bridge.  The new bridge is in the same location and the county road was closed to traffic during construction.  The new bridge is a single 26 meter span on pile end bents.  The framing consists of 4 Type CB 840 x 1220 box beams set side by side and a composite concrete deck.  Construction was completed in July 1997.  The cost of the project was $136,603.

 

The Consultant was responsible for:

 

1.         Provided Surveys.                 3.         Final Construction Plans, Specifications and Cost Estimates.

2.         Drainage Design                   4.         Checking Shop Plans.

 

The Department was responsible for:

 

1.         Geotechnical Data.                 2.         Construction Supervision.

 

 

 

 

 

 

BLOOMINGTON CHURCH ROAD

OVER BEAR CREEK

GRAYSON CO.

NEAR LEITCHFIELD, KY

DISTRICT 4