State:
KENTUCKY Agency: KENTUCKY
DEPARTMENT OF TRANSPORTATION - DISTRICT 5 Project and/or Route Name: RIVER ROAD (KY 7163) OVER
BEARGRASS CREEK Dates: 1996 -
1997 Rural
and/or Urban: URBAN Length: 100 METERS Type of Improvement: RELOCATION AND WIDENING OF RIVER
ROAD Firm's Project Manager: ROBERT B. QUISENBERRY,P.E.,L.S.,V.P.-STRUCTURES, FIRM
PRINCIPAL Firm's
Project Engineer: PAUL L. HENDRICK,
P.E., PROJECT STRUCTURAL DESIGN ENGINEER Roadway Project Manager: H.E. RUDY CONSULTING ENGINEERS (JDQ SUBCONSULTANT) Project Description: H. E. Rudy Consulting Engineers was the prime
consultant on this project and JDQ
was the subconsultant for bridge design only. The bridge is a three span structure with spans
of 19, 29 and 19 meters. The overall length is 67.9 meters and the
width is 16.6 meters. The framing
consists of seven lines of Type 4
PCI-Beams with a composite
concrete deck. The bridge is skewed 10 degrees left.
The substructure consists of
Integral End Bents on piling and two Intermediate Pile Bents. Cofferdams
are required at intermediate bents. The estimated cost of the bridge is
$760,000. All plans are in metric units. Bridge construction was completed in 1999. Johnson, Depp & Quisenberry was
responsible for: 1. Bridge
Design and preparation of Advance
Situation Folder, Preliminary Structure Plans and Final Structure Plans, Specifications and Cost Estimates. H. E. Rudy Consulting Engineers was responsible
for: The Department was responsible for: 1. Survey Work. 1. All Geotechnical Work. 2. Drainage Design. 3. Final Roadway Construction Plans,
Specifications and Cost Estimates. |