State: ILLINOIS Agency: ILLINOIS
DEPARTMENT OF TRANSPORTATION - DISTRICT 9 Project and/or Route Name: F.A.
ROUTE IL 13/IL 127 JACKSON & PERRY COUNTIES, ILLINOIS
– PHASE I Dates: 2000 –
PRESENT Rural
and/or Urban: RURAL
EXPRESSWAY Length: 24 MILES Type of
Improvement: NEW DIVIDED
FOUR-LANE EXPRESSWAY ALONG PRESENT 2-LANE ALIGNMENT Firm's Project Manager: MICHAEL G. BRUCE, P.E., L.S., VICE
PRESIDENT, FIRM PRINCIPAL Firm's Project Engineer: THOMAS D. WILLIAMS, P.E., PROJECT DESIGN
ENGINEER Firm's Structural Engineer: DAVID C. DEPP, P.E., VICE PRESIDENT, FIRM
PRINCIPAL Firm's Project Engineer: J. PAUL BIGGERS, P.E., ENVIRONMENTAL
MANAGER Project
Description: This project involved preparation of Phase I Design studies and environmental
studies for IL 13/IL 127, IL 149 at Murphysboro to Pinckneyville, including
study of bypass routes at Vergennes and Pinckneyville. The Consultant was responsible for Studies and Surveys
including: 1. Contacting all property owners. 2. All
surveys including centerline location, drainage and section
corner locations. 3. Design Location and Environmental
Studies. 4. Preliminary
Right-of-Way plans as well as establishing
existing property lines and ROW. 5. Preparing drainage situation drawings and calculations and compiling drainage folders for the bridges
and box culverts on the project. 6. Preparing several alternate alignment
studies for bypass routes at Vergennes and Pinckneyville. The Department was responsible for
providing: 1. Aerial
manuscripts and digitized cross sections. 2. Title Commitments and available
existing ROW plans. 3. Traffic
counts and traffic movements. 4. Bridge
Conditions Reports. |