State: ILLINOIS Agency: ILLINOIS
DEPARTMENT OF TRANSPORTATION - DISTRICT 6 Project and/or Route Name: SANGAMON RIVER TWIN BRIDGES - FAI-55 OVER SANGAMON RIVER SANGAMON COUNTY Dates: 1991 –
1992 Rural
and/or Urban: RURAL Length: 1,125 FEET Type of Improvement: REHABILITATION AND WIDENING OF
BRIDGE AND APPROACHES Firm's Project Manager: ROBERT B. QUISENBERRY,P.E.,L.S.,V.P.-STRUCTURES, FIRM
PRINCIPAL Firm's Project Engineer: PAUL L. HENDRICK, P.E., PROJECT DESIGN
ENGINEER Project
Description: This
project involved the rehabilitation
and widening of the twin eleven
span bridges and approaches for the structures. Substructure units
were widened on both sides. The existing
deck was replaced and new girders added. Existing girders were repaired and retrofitted for fatigue.
The design was completed in 1992.
Construction is currently underway.
Estimated construction cost $7,500,000. The
Consultant
was responsible for: 1. Providing surveys. 2. All design and construction plans for the roadway approaches and the structures. 3. Specifications and cost estimates. The
Illinois Department of Transportation was responsible for: 1. An approved T.S. & L. Plan. 2. Geotechnical work. |