State: ILLINOIS Agency: ILLINOIS DEPARTMENT OF
TRANSPORTATION - DISTRICT 6 Project and/or Route Name: N.B. FANCY CREEK
BRIDGE - FAI-55 OVER N.B. FANCY CREEK SANGAMON COUNTY Dates: 1991 -
1992 Rural
and/or Urban: RURAL Length: 151 FEET Type of Improvement: WIDENING AND DECK REPLACEMENT Firm's Project Manager: ROBERT B. QUISENBERRY,P.E.,L.S.,V.P.-STRUCTURES, FIRM
PRINCIPAL Firm's Project Engineer: PAUL L. HENDRICK, P.E., PROJECT DESIGN
ENGINEER Project
Description: This project involved the widening
and deck replacement for a 3-span bridge in a curved alignment. Substructure units were widened on both
sides and raised to accommodate new rate of superelevation. New steel girders were added and existing
girders checked for fatigue. New
approach slabs and abutment backwalls were required. All bearings were replaced with new
bearings. Design was completed in
1992 and construction is scheduled for fall of 1992. Estimated construction cost $750,000. The
Consultant was responsible for: 1. Providing
surveys. 2. All design and construction plans for the roadway
approaches and the structure. 3. Specifications and cost estimates. The
Illinois Department of Transportation was responsible for: 1. All
geotechnical work. 2. Approved
T.S. & L. Plans. |