State: ILLINOIS Agency: ILLINOIS DEPARTMENT OF
TRANSPORTATION - DISTRICT 6 Project and/or Name: S.B. FANCY CREEK BRIDGE - FAI-55 OVER S.B. FANCY CREEK SANGAMON COUNTY Dates: 1991 - 1992 Rural
and/or Urban: RURAL Length: 151 FEET Type of Improvement: DECK REPLACEMENT FOR 3-SPAN BRIDGE Firm's Project Manager: ROBERT B. QUISENBERRY,P.E.,L.S.,V.P.-STRUCTURES, FIRM
PRINCIPAL Firm's Project Engineer: PAUL L. HENDRICK, P.E., PROJECT DESIGN
ENGINEER Project
Description: This project involved deck replacement for a 3-span bridge using existing girders and substructure
units. The bridge was located in a curved alignment. The work also consisted of replacing all bearings and raising the
bridge to accommodate a new rate of superelevation across the
bridge. The design was completed in
1992. Construction is scheduled to
begin in fall of 1992. Estimated
construction cost $500,000. The
Consultant was responsible for: 1. Providing
surveys. 2. Complete
Design and Details for Construction
Plans for the roadway approaches
and the structure. 3. Specifications and Cost Estimates. The
Illinois Department of Transportation provided: 1. Approved
T.S. & L. Plans. 2. All