State:                                      ILLINOIS

 

Agency:                                  ILLINOIS DEPARTMENT OF TRANSPORTATION - DISTRICT 6

 

Project and/or Name:           S.B. FANCY CREEK BRIDGE - FAI-55 OVER S.B. FANCY CREEK

                                                SANGAMON COUNTY

 

Dates:                                     1991 - 1992

 

Rural and/or Urban:              RURAL

 

Length:                                   151 FEET

 

Type of Improvement:          DECK REPLACEMENT FOR 3-SPAN BRIDGE

 

Firm's Project Manager:      ROBERT B. QUISENBERRY,P.E.,L.S.,V.P.-STRUCTURES, FIRM PRINCIPAL

Firm's Project Engineer:     PAUL L. HENDRICK, P.E., PROJECT DESIGN ENGINEER

 

Project Description:

 

This project involved deck replacement for a 3-span bridge using existing girders and substructure units.  The bridge was located in a curved alignment.  The work also consisted of replacing all bearings and raising the bridge to accommodate a new rate of superelevation across the bridge.  The design was completed in 1992.  Construction is scheduled to begin in fall of 1992.  Estimated construction cost $500,000.

 

 

The Consultant was responsible for:

 

1.         Providing surveys.

2.         Complete Design and Details for Construction Plans for the roadway approaches and the structure.

3.         Specifications and Cost Estimates.

 

 

The Illinois Department of Transportation provided:

 

1.         Approved T.S. & L. Plans.

2.         All geotechnical work.